NIGERIA
In Nigeria, our installation team successfully finished the installation of a 1000m³ biogas dome. Our installation team finished the project in 5 days.
Products:
- 1x Biogas Dome Ø12.1 meter
Specifications:
- Gas production/withdrawal: 1000m³/h
- Yearly production: 8760000 m³
Membranes used:
- Inner membrane: 1200 grs./㎡
- Outer membrane: 1400 grs./㎡
- Bottom membrane: 1000 grs./㎡
- High frequently welded
