NIGERIA

In Nigeria, our installation team successfully finished the installation of a 1000m³ biogas dome. Our installation team finished the project in 5 days.

Products:

  • 1x Biogas Dome Ø12.1 meter

Specifications:

  • Gas production/withdrawal: 1000m³/h
  • Yearly production: 8760000 m³

Membranes used:

  • Inner membrane: 1200 grs./㎡
  • Outer membrane: 1400 grs./㎡
  • Bottom membrane: 1000 grs./㎡
  • High frequently welded